在线赌博平台

ͳ��ָ�����


�������ۺ���ָ��
����General Survey
�������˿����Ͷ�����
   
Population,Labour
    Force and Wages

�������̶��ʲ�Ͷ��
    Investment in
    Fixed Assets

���������������
����
Public Finance
����and Price

���������н���ͻ�������
����Urban Construction
����and Environmental
����Protection
��

�����������������ḣ��
����People's Life and
����Social Welfare

������ũ �� �� ��
����Rural Economy
�������� ����ҵ
����Industry
��������������ҵ����
����Construction
��������ͨ������ʵ�ͨ��
����Transportation,
����Post and
����Telecommunications

��������������ó�ײ���ҵ
����Wholesale,Retail
����Trade and Catering

���������⾭��ó�׺�����
����Foreign Economic Trade
����Cooperation
����and Tourism

���������ںͱ���ҵ
����BANKING AND INSURANCE
�����������Ϳ�ѧ����
����Education and
����Science & Technology

����������������������
����Culture,Sports,
����Public Health
����and Others

�������ĸ↑�����г���չ
����Reform & Opening Up
����and Development
����of Market

��

dir_bottom.gif (1129 bytes)

���� IE4.0 ���ϰ汾 800 * 600 �����



CONSTRUCTION

Output Value of Projects Under Construction refers to the gross outp ut value of construction and installation projects that are undertaken by constr uction and enterprises or affiliated constructing units, calculated in line with the planned schedule. It includes:

(a) Output Value of Construction Projects is the value of projects c overed by the project budgets, including the value of various buildings and stru ctures, the value of the installation projects of central heating, public health , ventilation, lighting, gas, etc.,the building of the base of equipment, pillar , operation desk, ladder, funnel, water tower, the building boiler room and inst allation of metals construction, arrange construction site, level the land, temp orary expenses of water, electrical, pave the way, cutting mine, well drilling c onstruction of oil, gas, the building engineering of railways, highways, port an d bridges, water engineering, output value of building decoration, air defense, underground.

(b) Output Value of Installation Projects is the value of the instal lation of equipment, (excluding the value of the equipment to be installed), mai nly including production, power, lifting, transportation, medical treatment, exp erimentation, telecommunications, fibre optics, telephone, computer, electronic equipment, working desk, ladder, banisters, insulation, heat preservation, pain t,etc.

(c) Output Value of Repair of Buildings and Structures is the value created through the repairs of buildings or structures, but does not include th e value of buildings or structures being repaired and the value of the repair of production equipment.

(d) Output Value of Manufactured Non-standard Equipment is the value of non-standard production equipment (including raw materials and manufactur in g cost) made for the construction project and the equipment manufactured by subs idiary workshops.

















�����ͳ�ƾ�
����к�ƽ���Ͼ�·244��




沙巴体育 皇冠体育 DB电子 澳门银河网上赌场 皇冠体育 美高梅博彩